Leica Tcr805 Total Station User Manual Work __full__
The instrument features a alphanumeric keyboard paired with a liquid crystal display (LCD). The most critical buttons include:
Press the ALL key. The station records point number, horizontal angle, vertical angle, slope distance, and calculated 3D coordinates instantly. 5. Construction Stakeout (Setting Out)
[Main Menu] └── [1. Manage] └── [Jobs] └── [F1: NEW] ──> Enter Job Name & Operator Press the key. Select 1. Manage and then press Jobs . Press F1 (NEW) to create a new project folder. leica tcr805 total station user manual work
The Leica TCR805 is not an isolated instrument; it is designed to work seamlessly with office software.
: Allows you to set out or measure points relative to a defined line, which is essential for road or building alignment. Rapid Measurements The instrument features a alphanumeric keyboard paired with
Are you performing a or setting up over a known point ?
: Uses a visible red laser beam. Designed for inaccessible structures, building facades, overhead wires, or hazardous topography. Standard Topographic Data Collection Navigate to the Main Menu and select Surveying . Ensure the correct active job is selected. Aim the crosshairs at the target prism. Enter the Point ID and Target Height ( Select 1
: Simply point the telescope at a target prism and press the measure key. The instrument will measure and store the horizontal angle, vertical angle, and slope distance, then compute and record the point's coordinates in the internal memory. The manual details how to interpret the display symbols that confirm a successful measurement.
Adjust the height of the individual tripod legs to center the physical circular bubble on the tribrach.
If you operate the total station in the rain, do not pack it away wet. Wipe it down with a soft cloth and leave the hard case open overnight in a warm room to let any trapped moisture evaporate naturally.
Manually records the displayed measurement values to the internal memory.